AI Project Plans
Describe the project. Get the steps, materials, tools, costs and schedule.
The hardest part of most home projects is turning "redo the laundry room" into a list you can act on. Describe the project to Blueprint and it drafts the whole plan: step-by-step instructions, the materials and tools it takes, a cost estimate and a schedule. Then you make it yours, editing any part with AI or by hand.

Why it matters
A complete plan from a description
One paragraph about what you want becomes a full working plan: ordered steps, the materials list, the tools required, an estimated cost and a schedule.
Editable down to the step
The draft is a starting point, not a verdict. Rewrite a step with AI, swap a material, adjust a quantity or reorder the work by hand until the plan matches your house and your weekend.
A cost estimate before you commit
Every plan carries an estimate of what the project should cost. It's the number that decides whether this is a DIY month, and the baseline for judging contractor quotes.
Plans that become tracked projects
The plan isn't a document you file away. It's a live project in Blueprint: check off steps, track spending against the estimate and watch completion move.
How it works
- 01
Describe the project
Tell Blueprint what you want to do in plain language: the space, the goal, whatever constraints matter. More detail sharpens the draft, but a couple of sentences is enough to start.
- 02
Review the draft
Blueprint returns the full plan: steps, materials, tools, cost estimate and schedule. Read it like you'd read a contractor's proposal, because that's the role it plays.
- 03
Edit and work it
Fix anything the AI got wrong for your situation, with AI edits or by hand, then work the plan as a tracked project with steps to check off.
AI plans FAQ
How many AI plans do I get?
Pro includes 10 AI project plans and 100 AI edits per month. Manual projects are unlimited, so the AI budget goes to the projects where a drafted plan saves you real research time.
What does an AI plan actually include?
Step-by-step instructions, a materials list, the tools required, a cost estimate and a schedule. It arrives as a working project you can start checking off, not a wall of text.
Can I change what the AI generates?
Yes, every part of it. Ask the AI to revise a section (Pro includes 100 AI edits a month) or edit steps, materials and costs directly by hand. The plan is yours the moment it's drafted.
How accurate are the cost estimates?
They're a well-grounded starting point, not a bid. Prices vary by region and by what your house reveals once you open a wall, so treat the estimate as the number to refine with local prices, and always check local code requirements.
Is the AI planner an extra charge?
No. It's included in Blueprint Pro at $7.99 a month or $49.99 a year, which works out to $4.17 a month on annual. The annual plan starts with a 7-day free trial.
More of what Blueprint tracks
How Blueprint compares
Get started
Your house deserves a set of drawings.
Start your free trial, add your home, and let Blueprint draft the first plan tonight.
Start your free trial7-day free trial on annual plans. Cancel anytime.